Intensive Tempo

If intensive tempo was to be done on Saturday (with speed work on M-W-F), the surface would be an aspect to consider in my opinion. Although such a set up with hill work is quite stressful, the latter multiplies, if intensive tempo is to be done on track.

Also, if the 8x60s on a hill are to be done with full recovery, they would probably count as SE. Others?